How to Graphically Schedule Doors

How to Graphically Schedule Doors

Showing a Graphic Schedule for Aluminium/Glazed Doors/Windows is a common Architectural practice that unfortunately Revit doesn’t make particularly easy. Revit has the concept of Legend Components which was Autodesk’s intended tool for this purpose.


Legend Components

Legend Components can be placed in Legend Views, they allow you to place a Graphical representation of the Family Type for loadable Family Types and System Families to show Plan, Section and Front/Back Orientation dependent on the Family Category.

Limitations

WARNING:

There are a number of major limitations of Legend Components;

  • System Families cannot be dimensioned (Walls, Floors, Ceilings, Roofs), only Loadable Family Types

  • Elements cannot be Tagged either By Category, Material or Keynote as such you have to resort to Text and linework, or preferably custom built Generic Annotation families with instance parameters to edit. However, this then presents a coordination issue.

  • You cannot set Instance Parameters, so if the families rely mainly on Instance parameters for sizing and their appearance then Legend Components are completely useless.

Legend Component Example

Pre-Phased Elements

The smarter and more flexible approach is to utilise the Administration Phase within the Template.

Phasing

Using the Administration Phase for Graphical Schedules

Phase Settings

 

  1. Duplicate the Ground Floor - Working Floor Plan

  2. Name it Ground Floor - Graphical Schedules

  3. Change the Phase to Administration and Phase Filter to New Demo & Temp

  4. Place a Long Horizontal Wall

  5. Place each of your Door Types within the Wall and set your Door instance properties as required to achieve the required appearance

  6. Place a Working Section Parallel with the Wall to View all of the Doors and Name it your Graphical Door Schedule, you may want to make use of Dependent Views here.

  7. Adjust the Visibility/Graphic Overrides to only see the Host Wall, Doors and any required Tags/Levels

  8. Select the entire Wall and all the Doors within it and set their Phase Demolished as Administration

  9. Adjust the Phase Filter to Administration in both the Section and Plan

NOTE:

  • This ensures that none of these elements are scheduled or shown in any subsequent phases and documentation.

Graphical Schedule

NOTE:

  • Utilise the Graphical Schedule to show Type Marks, then place traditional text schedules below the graphical schedule which refer back to the Graphical Schedule.